Freephone
0800 022 3096

Initial Notice Application

Name
(Required for confirmation purposes)
Telephone
(Required for confirmation purposes)
Email Address
(Required for confirmation purposes)

Section 1

To:- Building Control Manager

Local Authority

Section 2

This notice relates to the following work:-

Description of work
Address
Use of building

Section 3

The approved inspector in relation to the work is:-

Complete Building Control Ltd
36 George Road, Edgbaston, Birmingham, West Midlands, B15 1PL.
Tel: +44 121 212 3145
Fax: +44 844 669 7831

The Person carrying out the work is:

Name
Address

Section 4

With the notice are the following documents, relevant to the work described in the Notice:

(A) In the case of a notice given by an inspector approved following an application under regulation 4(1) of the 2010 Regulations, a copy of the notice of approval:

(B) A declaration signed by the insurer that a named scheme of insurance approved by the Secretary of State applies in relation to the work described in the Notice.

(C) In the case of the erection or extension of a building, a plan to scale of not less than 1:1250 showing the foundries And location of the site and ( where the work includes the construction of a new drain or private sewer} a statement-

(ii) As to the approximate location of any proposed connection to be made to a sewer, or

(iii) If no connection is to be made to a sewer, as to the proposals for the discharge of the proposed drain of private Sewer including the location of any septic tank and associated secondary treatment system, or any wastewater Treatment system or any cesspool:

(D) A statement of any local enactment relevant to the work, and of the steps to be taken to comply with it.

Section 5

Is this work minor work?

Yes
No

Section 6

Complete Building Control Ltd Declare that we do not, and will not while this notice is in force, have any financial or Professional interest in the works described.

Section 7

Will the approved inspector be obliged to consult the fire and rescue authority by regulation 12 of the 2010 Regulations?

Yes
No

Section 8

Complete Building Control Ltd Undertake to consult the fire and rescue authority before giving a plans certificate In accordance with section 50 of the Act or a final certificate in accordance with section 51 of the Act in respect Of any of the work described above (Delete as applicable}

Section 9

Will the approved inspector be obliged to consult the sewerage undertaker by regulation 13 of the 2010 Regulations?

Yes
No

Section 10

Complete Building Control Ltd undertake to consult the sewerage undertaker before giving a plans certificate in Accordance with section 50 of the Act or a final certificate in accordance with section 51 of the Act in respect of any Work described above (Delete as applicable)

Section 11

Complete Building Control Ltd is aware of the obligations laid upon them by part 2 of the Act and by regulation 8 Of the 2010 Regulations.

Section 12

Complete Building Control Ltd Approved Inspector

Complete Building Control Ltd

on behalf of person intending to carry out work

Date
06/01/2016

Section 13

Upload your drawings/documentation

it is highly recommended that you compress your files into a single file (Zip) to reduce upload time.

File 1
File 2
File 3
File 4
File 5

Alternatively enter a share link from a online storage provider such as Dropbox

Share Link